Engineering, 19.06.2020 15:57 isaacgarcia0830

Precast double-tee units are generally used as structural floors when:. a. floor spans are short and loads are high.
b. floor spans exceed that which is economical with site-cast or hollow-core slabs.
c. floor spans exceed 60 feet.
d. floor spans exceed that which is economical with site-cast or hollow-core slabs and exceed 60 feet.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
question
Engineering, 04.07.2019 18:10
Thermal stresses are developed in a metal when its a) initial temperature is changed b) final temperature is changed c) density is changed d) thermal deformation is prevented e) expansion is prevented f) contraction is prevented
Answers: 2
question
Engineering, 04.07.2019 18:10
You are making beer. the first step is filling the glass carboy with the liquid wort. the internal diameter of the carboy is 15 in., and you wish to fill it up to a depth of 2 ft. if your wort is drawn from the kettle using a siphon process that flows at 3 gpm, how long will it take to fill?
Answers: 1
question
Engineering, 04.07.2019 18:20
Aquick transition of the operating speed of a shaft from its critical speed will whirl amplitude. (a) increase (b) limit (c) not affect (d) zero
Answers: 2
You know the right answer?
Precast double-tee units are generally used as structural floors when:. a. floor spans are short an...
Questions
question
Mathematics, 20.08.2019 04:20
question
Mathematics, 20.08.2019 04:20
question
Biology, 20.08.2019 04:20
question
Mathematics, 20.08.2019 04:20
question
Mathematics, 20.08.2019 04:20
question
Mathematics, 20.08.2019 04:20
Questions on the website: 13722359