During one eight-hour shift, 750 non-defective parts are desired from a fabrication operation. The standard time for the operation is 15 minutes. Because the machine operators are unskilled, the actual time it takes to perform the operation is 20 minutes, and ,on average, one-fifth of the parts that begin fabrication are scrapped. Assuming that each of the machines used for this operation will not be available for one hour of each shift, determine the number of machines required.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:20
The characteristic roots of a dynamic system are: 1.7920 1.8160 i, -1.7920 1.8160 i, -0.4160 what is the order of this system? what are the settling time and damping ratio of the system?
Answers: 3
question
Engineering, 04.07.2019 19:10
What is a monomer? how do they form a ploymer from the view point of chemical bonding?
Answers: 1
question
Engineering, 04.07.2019 19:10
The maximum shear stress and maximum flexural stress occur at the same location along a beam subjected to a non-uniform bending load. a)-trune b)- false
Answers: 2
question
Engineering, 04.07.2019 19:20
Brief discuss how the presence of dislocations in crystal structures can be an advantage and a disadvantage to engineer and designers.
Answers: 3
You know the right answer?
During one eight-hour shift, 750 non-defective parts are desired from a fabrication operation. The s...
Questions
question
English, 11.11.2021 14:00
question
Mathematics, 11.11.2021 14:00
question
Chemistry, 11.11.2021 14:00
question
Mathematics, 11.11.2021 14:00
Questions on the website: 13722360