Under the CSI Format, the definition of Contract Documents does not include the Notice Inviting Bids, Instructions to Bidders, or the Bid itself. Name the principal exception to this rule, wherein the term Contract Documents may include the Notice Inviting Bids, Instructions to Bidders, and the Bid itself.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The higher the astm grain-size number, the coarser the grain is. a)-true b)-false
Answers: 3
question
Engineering, 04.07.2019 18:10
Courses that are developed by subject matter experts, internal or extemal to the college or university. these programs are marketed by the school (clo2) marks a)-vocational schools b)-vendor training c)-colleges & universities d)-continuing education programs
Answers: 2
question
Engineering, 04.07.2019 18:10
Awall of 0.5m thickness is to be constructed from a material which has average thermal conductivity of 1.4 w/mk. the wall is to be insulated with a material having an average thermal conductivity of 0.35 w/mk so that heat loss per square meter shall not exceed 1450 w. assume inner wall surface temperature of 1200°c and outer surface temperature of the insulation to be 15°c. calculate the thickness of insulation required.
Answers: 3
question
Engineering, 04.07.2019 18:20
Avolume of 2.65 m3 of air in a rigid, insulated container fitted with a paddle wheel is initially at 264 k, 5.6 bar. the air receives 432 kj by work from the paddle wheel. assuming the ideal gas model with cv = 0.71 kj/kg • k, determine for the air the amount of entropy produced, in kj/k
Answers: 2
You know the right answer?
Under the CSI Format, the definition of Contract Documents does not include the Notice Inviting Bids...
Questions
question
Mathematics, 05.02.2020 04:02
question
Mathematics, 05.02.2020 04:02
Questions on the website: 13722367