subject
Engineering, 22.07.2020 21:01 perezesmeralda78

A drilling operation is to be performed with a 12.7 mm diameter drill on cast iron. The hole depth is 60 mm and the drill point angle is 118∘. The cutting speed is 25 m/min and the feed is 0.30 mm/rev. Calculate:. a) The cutting time (min) to complete the drilling operation
b) Material removal rate (mm3/min) during the operation, after the drill bit reaches full diameter.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Air is to be cooled in the evaporator section of a refrigerator by passing it over a bank of 0.8-cm-outer-diameter and 0.4-m-long tubes inside which the refrigerant is evaporating at -20°c. air approaches the tube bank in the normal direction at 0°c and 1 atm with a mean velocity of 4 m/s. the tubes are arranged in-line with longitudinal and transverse pitches of sl- st 1.5 cm. there are 30 rows in the flow direction with 15 tubes in each row. determine (a) the refrigeration capacity of this system and (b) pressure drop across the tube bank. evaluate the air properties at an assumed mean temperature of -5°c and 1 atm. is this a good assumption?
Answers: 1
question
Engineering, 04.07.2019 18:10
Calculate the bore of a cylinder that has a stroke of 18 inches and an extension time of 6 seconds at a flow rate of 4 gal/min.
Answers: 3
question
Engineering, 04.07.2019 18:20
Inspection for bearing condition will include: (clo4) a)-color b)-smell c)-size d)-none of the above
Answers: 1
question
Engineering, 04.07.2019 19:10
What is the main objective of using reheat rankine cycle?
Answers: 3
You know the right answer?
A drilling operation is to be performed with a 12.7 mm diameter drill on cast iron. The hole depth i...
Questions
question
Mathematics, 16.06.2020 22:57
question
Mathematics, 16.06.2020 22:57
question
English, 16.06.2020 22:57
question
Mathematics, 16.06.2020 22:57
question
Mathematics, 16.06.2020 22:57
Questions on the website: 13722361