subject
Engineering, 15.08.2020 01:01 sophiaaafaline

Only an outer panel is being replaced. Technician A says that removing the spot welds by drilling through both panels allows the plug welds to be made through the replacement outer panel. Technician B says that placing a metal tab between panels may help prevent cutting into the flange. Who is right

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 14:10
If the thermal strain developed in polyimide film during deposition is given as 0.0044. assume room temperature is kept at 17.3 c, and thermal coefficient of expansion for the film and the substrate are 54 x 10^-6c^-1 and 3.3 x 10^-6c^-1respectively. calculate the deposition temperature.
Answers: 3
question
Engineering, 04.07.2019 12:10
On a average work day more than work place firs are reorted
Answers: 1
question
Engineering, 04.07.2019 18:10
Water in a partially filled large tank is to be supplied to the roof top, which is 8 m above the water level in the tank, through a 2.2-cm-internal-diameter pipe by maintaining a constant air pressure of 300 kpa (gage) in the tank. if the head loss in the piping is 2 m of water, determine the discharge rate of the supply of water to the roof top in liters per second.
Answers: 3
question
Engineering, 04.07.2019 18:10
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
You know the right answer?
Only an outer panel is being replaced. Technician A says that removing the spot welds by drilling th...
Questions
question
Mathematics, 04.07.2019 02:00
question
Mathematics, 04.07.2019 02:00
question
Mathematics, 04.07.2019 02:00
question
Business, 04.07.2019 02:00
Questions on the website: 13722361