subject
Engineering, 15.08.2020 20:01 jazmaine1217

Air flows over a 4 meter long flat plate at a velocity of 8 m/s. Using a spreadsheet, calculate the boundary layer thickness and wall shear stress at 0.1 meter intervals along the plate. Do not plot the wall shear stress at x

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Courses that are developed by subject matter experts, internal or extemal to the college or university. these programs are marketed by the school (clo2) marks a)-vocational schools b)-vendor training c)-colleges & universities d)-continuing education programs
Answers: 2
question
Engineering, 04.07.2019 18:10
Aturning operation is performed with following conditions: rake angle of 12°, a feed of 0.35 mm/rev, and a depth of cut of 1.1 mm. the work piece is aluminum alloy 6061 with t6 heat treatment (a16061-t6). the resultant chip thickness was measured to be 1.0 mm. estimate the cutting force, fc. use shear stress of 207 mpa and coefficient of friction on the tool face of 0.6.
Answers: 1
question
Engineering, 04.07.2019 18:20
Acertain flow of air (at stp) has a velocity distribution given by v i (in ft/s). if this flow is going through a 4 ft square area in the yz-plane (centered at the origin), what is the mass flow rate (in lbm/s)?
Answers: 2
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
Air flows over a 4 meter long flat plate at a velocity of 8 m/s. Using a spreadsheet, calculate the...
Questions
question
Mathematics, 28.04.2021 01:10
question
Arts, 28.04.2021 01:10
question
Mathematics, 28.04.2021 01:10
question
Mathematics, 28.04.2021 01:10
question
Mathematics, 28.04.2021 01:10
question
Mathematics, 28.04.2021 01:10
question
Mathematics, 28.04.2021 01:10
question
Mathematics, 28.04.2021 01:10
Questions on the website: 13722362