subject
Engineering, 19.08.2020 18:01 gtrsoccer

A space has a sensible heating load of 60,000 W. The space is to be maintained at 21°C DB while the outdoor air is at 1°C DB and 20% RH. On coil air at 15°C is heated, humidified at the rate of 8 g/s, and supplied to the space at 31°C DB and 25% RH. Determine: a. The total amount of air supplied to the space; b. The amount of outdoor air supplied to the space; C. The relative humidity of the space. 3 Plot the process on a Psychrometric chart.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Ariver flows from north to south at 8 km/h. a boat is to cross this river from west to east at a speed of 20 km/h (speed of the boat with respect to the earth/ground). at what angle (in degrees) must the boat be pointed upstream such that it will proceed directly across the river (hint: find the speed of the boat with respect to water/river)? a 288 b. 21.8 c. 326 d. 30.2
Answers: 3
question
Engineering, 04.07.2019 18:10
You are making beer. the first step is filling the glass carboy with the liquid wort. the internal diameter of the carboy is 15 in., and you wish to fill it up to a depth of 2 ft. if your wort is drawn from the kettle using a siphon process that flows at 3 gpm, how long will it take to fill?
Answers: 1
question
Engineering, 04.07.2019 19:10
What is the chief metrological difference between measuring with a microscope and with an electronic comparator? a. the microscope is limited to small workpieces.a. the microscope is limited to small workpieces. c. the comparator can only examine one point on the workpiece. d. the microscope carries its own standard.
Answers: 1
question
Engineering, 04.07.2019 19:20
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
You know the right answer?
A space has a sensible heating load of 60,000 W. The space is to be maintained at 21°C DB while the...
Questions
question
Physics, 12.04.2021 18:10
question
Mathematics, 12.04.2021 18:10
question
English, 12.04.2021 18:10
question
Mathematics, 12.04.2021 18:10
question
Computers and Technology, 12.04.2021 18:10
Questions on the website: 13722359