subject
Engineering, 04.09.2020 19:01 savidgarcia303

please help At corporate (business) organization level projects could be divided into broad two phases, the construction or development phase and operational or commercialization (commencement of operations) phase, therefore the project risk management process shall cover both phases of the project to ensure organization success. In this regards explain your own comprehension on the following points; 1. Project risk during construction phase (what type of risk will be assessed during this phase) 2. Project risk during operational or commercialization phase, (what type of risk will be assessed during this phase) 3. Which phase of project risk will be carrying higher weight (importance) for an organization, and why would you think so (give rationale).

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
An air conditioning system consist of a 5 cm diameter pipe, operating at a pressure of 200 kpa. the air initially enters the pipe at 15°c with a velocity of 20 m/s and relative humidity of 80%. if the heat supply throughout the process is 960 w, determine the relative humidity and the temperature at the outlet
Answers: 3
question
Engineering, 04.07.2019 18:10
Which of the following controllers anticipates the future from the slope of errors over time? a)-proportional b)-on/off c)-integral d)-derivative.
Answers: 2
question
Engineering, 04.07.2019 18:20
Have a greater impact on maintenance productivity than any other support group. (clo5) a)-the top management b)-inventory and purchasing c)-sub-contracting d)-cmms
Answers: 2
question
Engineering, 04.07.2019 18:20
Agas mixture consists of 8 kmol of h2 and 2 kmol of n2. determine the mass of each gas and the apparent gas constant of the mixture.
Answers: 3
You know the right answer?
please help At corporate (business) organization level projects could be divided into broad two phas...
Questions
Questions on the website: 13722363