subject
Engineering, 23.09.2020 08:01 amandabarriksofficia

A manual assembly line has 20 workstations with one operator per station. Total work content time to assemble the product = 28.4 min. Production rate = 36 units/hour. An asynchronous transport system is used to advance the products from one station to the next, and the transfer time = 6 sec. The workers remain seated along the line. Proportion uptime =0.96. Determine the line balancing efficiency.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:20
An engine runs on the ideal diesel cycle. the cycle has a compression ratio of 20 and a cutoff ratio of 2. the highest temperature in the cycle is 1200 k. if the heat into the system is 300 kj/kg of working fluid and using variable specific heats determine the work produced per mass of working fluid
Answers: 3
question
Engineering, 04.07.2019 18:20
Asimple rankine cycle uses water as the working fluid. the water enters the turbine at 10 mpa and 480c while the condenser operates at 6 kpa. if the turbine has an isentropic efficiency of 80 percent while the pump has an isentropic efficiency of 70 percent determine the thermal efficiency
Answers: 1
question
Engineering, 04.07.2019 19:10
Asteel wire of 2 mm diameter is fixed between two points located 2 m apart. the tensile force in the wire is 250n, if its density of steel is given by 7830 kg/m3 the fundamental frequency of vibration hz? ?
Answers: 3
question
Engineering, 06.07.2019 02:30
In a unit cell of fcc structure, indicate the position of one of the tetrahedral interstitial sites by plotting the corresponding tetrahedron. do the same for one of the octahedral interstitial sites (in a separate fcc unit cell). mark the positions of all the tetrahedral and octahedral interstitial sites in the unit cells. how many equivalent tetrahedral sites and how many equivalent octahedral sites are contained in a fcc unit cell, respectively. what is the coordination number for a tetrahedral site and what is the coordination number for an octahedral site?
Answers: 2
You know the right answer?
A manual assembly line has 20 workstations with one operator per station. Total work content time to...
Questions
question
Mathematics, 09.09.2021 04:10
question
Mathematics, 09.09.2021 04:10
question
Mathematics, 09.09.2021 04:10
question
Mathematics, 09.09.2021 04:10
question
Mathematics, 09.09.2021 04:10
question
Mathematics, 09.09.2021 04:10
Questions on the website: 13722359