subject
Engineering, 25.09.2020 03:01 Sbeech7246

Consider two machines with two different instruction sets. Machine A has a 2 GHz clock, and machine B has a 4 GHz clock. The following measurements are recorded upon execution of a program. Machine A Instruction Class
Arithmetic Load/Store Branch
Instruction Count (millions) 10 4 6
CPI 2 3 1
Machine B Instruction Class
Arithmetic Load/Store Branch
Instruction Count (millions) 14 5 8
CPI 2 8 1
For Machine A, what is the average CPI and execution time?
For Machine B, what is the average CPI and execution time?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Apiston-cylinder with a volume of 0.25 m3 holds 1 kg of air (r 0.287 k/kgk) at a temperature of 100 c. heat transfer to the cylinder causes an isothermal expansion of the piston until the volume triples. how much heat is added to the piston-cylinder?
Answers: 3
question
Engineering, 04.07.2019 18:10
During a steady flow process, the change of energy with respect to time is zero. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:10
Carbon dioxide gas expands isotherm a turbine from 1 mpa, 500 k at 200 kpa. assuming the ideal gas model and neglecting the kinetic and potential energies, determine the change in entropy, heat transfer and work for each kilogram of co2.
Answers: 2
question
Engineering, 04.07.2019 19:10
In general, how do thermosetting plastics compare to thermoplastics in mechanical and physical properties?
Answers: 3
You know the right answer?
Consider two machines with two different instruction sets. Machine A has a 2 GHz clock, and machine...
Questions
question
Chemistry, 31.08.2020 02:01
Questions on the website: 13722359