Engineering, 11.10.2020 23:01 ariellake8551

The maintenance manager of your facility has asked you to evaluate a particular welding booth that utilizes a local exhaust ventilation (LEV) system to remove the contaminant at the source. The exhaust system does not appear to be drawing enough of the welding fumes away from the employees to reduce the iron oxide below the permissible exposure limit (PEL) of 10 mg/m3. During your investigation, you determine that the diameter of the duct system is 8 inches and has an air velocity of 350 fpm (feet per minute). The welding operation is performed at a distance of 1.5 feet from the exhaust opening. 1. Determine the flow rate, and provide your recommendations on the control measures that could improve the capture of the iron oxide contaminant.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Draw the engineering stress-strain curve for (a) bcc; (b) fcc metals and mark important points.
Answers: 1
question
Engineering, 04.07.2019 19:10
With increases in magnification, which of the following occur? a. the field of view decreases. b. the ambient illumination decreases. c. the larger parts can be measured. d. the eyepiece must be raised.
Answers: 1
question
Engineering, 04.07.2019 19:20
Acompressor compresses a gas, a pump compresses a liquid. for a given pressure ratio, why does it take more work to compress a gas in a compressor than a liquid in a pump? a)- for a given pressure ratio the average specific volume for a gas is much higher than the average specific volume for a liquid. b)- there is no difference. the only difference is the amount of heat generated (not work) c)- for a given pressure ratio the average volurge for a gas is much higher than the average volume for a liquid. d)-there is no difference
Answers: 3
question
Engineering, 04.07.2019 19:20
Ashielded metal arc-welding operation is accomplished in a work cell by a fitter and a welder. the fitter takes 5.5 min to load components into the welding fixture at the beginning of the work cycle, and 1.5 min to unload the completed weldment at the end of the cycle. the total ength of the weld seams 1200 mm, and the travel speed used by the welder averages 300 mm/min. every 600 mm of seam length, the welding stick must be changed, which takes 0.8 min. while the fitter is working, the welder is idle (resting): and while the welder is working the fitter is idle. (a) determine the average arc-on time as a fraction of the work cycle time. (b) how much improvement in arc-on time would result if the welder used flux-cored arc welding (manually operated), given that the spool of weld wire must be changed every 10 weldments, and it takes the welder 5.0 min to accomplish the change? (c) what are the production rates for these two cases (weldments completed per hour)? attach your work and solutions.
Answers: 1
You know the right answer?
The maintenance manager of your facility has asked you to evaluate a particular welding booth that u...