subject
Engineering, 16.10.2020 14:01 waterborn7152

Technician A says that primer surface will dry faster if it is sprayed in several coats with flash time between each coat. Technician B says that there will be better adhesion if several coats are applied in just one application, then allowed to dry for several hours. Who's right?

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Refrigerant 134a enters an insulated compressor operating at steady state as saturated vapor at -26Β°c with a volumetric flow rate of 0.18 m3/s. refrigerant exits at 9 bar, 70Β°c. changes in kinetic and potential energy from inlet to exit can be ignored. determine the volumetric flow rate at the exit, in m3/s, and the compressor power, in kw.
Answers: 1
question
Engineering, 04.07.2019 18:10
The thermal expansion or contraction of a given metal is a function of the f a)-density b)-initial temperature c)- temperature difference d)- linear coefficient of thermal expansion e)- final temperature f)- original length
Answers: 2
question
Engineering, 04.07.2019 18:10
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 19:10
The short distance from the objective lens to the object causes problems at high magnification. which of the following is the most serious? a. cleaning the object surface b. positioning the object c. reflection from the object surface. d. illumination of the object
Answers: 1
You know the right answer?
Technician A says that primer surface will dry faster if it is sprayed in several coats with flash t...
Questions
question
Mathematics, 02.12.2020 21:30
Questions on the website: 13722359