subject
Engineering, 22.10.2020 06:01 SM141372

If there are 3 boards each requiring 2 screws at each rafter tail, how many screws are needed for the full run of 27 feet?
216 screws
126 screws
162 screws
120 screws

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
question
Engineering, 04.07.2019 19:10
An electric kettle is made out of stainless steel, weighs two pounds (when empty) and is equipped with a heating element that consumes 2 kw of electricity. assuming that the water and the kettle are at the same uniform temperature at any moment of time, calculate the shortest possible time to bring 2 quarts of water from room temperature to the onset of boiling
Answers: 2
question
Engineering, 06.07.2019 04:10
Ahousehold refrigerator operating steadily and with a coefficient of performance of 2.5 removes energy from a refrigerated space at a rate of 650 kj/h. evaluating electricity at $0.06 per kw.h, determine the cost of electricity in a month when the refrigerator operates for 360 hours.
Answers: 3
question
Engineering, 06.07.2019 04:20
At what temperature does the mole fraction of no reach 0.010 for the equilibrium products resulting from the combustion of gasoline and air at 1.0 and 5000 kpa?
Answers: 1
You know the right answer?
If there are 3 boards each requiring 2 screws at each rafter tail, how many screws are needed for t...
Questions
question
Mathematics, 28.04.2021 03:00
question
Mathematics, 28.04.2021 03:00
question
Mathematics, 28.04.2021 03:00
question
English, 28.04.2021 03:00
question
Mathematics, 28.04.2021 03:00
question
History, 28.04.2021 03:00
question
SAT, 28.04.2021 03:00
Questions on the website: 13722367