subject
Engineering, 22.10.2020 16:01 manarhizam12

The granularsoil will be compacted in the excavation made at the building site (i. e., a rectangular hole 4 mdeep) to achieve a dry unit weight of 20 kN/m3at a gravimetric water content of 10%. Determine the total volume of granularsoil (in cubic meters) that will be required from the quarry site, the number of 10metric ton dump truck trips that will be required to haul the granularsoil to the building site, and the total volume of water (in gallons) that will be neededto be added to the granularsoil at the building site tocompact itatthe target conditions.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Aturning operation is performed with following conditions: rake angle of 12°, a feed of 0.35 mm/rev, and a depth of cut of 1.1 mm. the work piece is aluminum alloy 6061 with t6 heat treatment (a16061-t6). the resultant chip thickness was measured to be 1.0 mm. estimate the cutting force, fc. use shear stress of 207 mpa and coefficient of friction on the tool face of 0.6.
Answers: 1
question
Engineering, 04.07.2019 18:20
Find the minimum film thickness for a journal bearing with the data below. shaft diameter, d-50 mm, clearance ratio, cdratio? 0.001, shaft speed, n 2000 rpm; bearing length. i 200 mm; eccentricity ration, ? -0.55. ( note, cdratio-ca/d) the minimum film thickness is um
Answers: 2
question
Engineering, 04.07.2019 18:20
An open feedwater heater operates at steady state with liquid entering at inlet 1 with t? = 40°c and pl = 1 .2 mpa. water vapor att2-200°c and p2 = 1.2 mpa enters at inlet 2. saturated liquid water exits with a pressure of pa 1.2 mpa. neglect heat transfer with the surroundings and all kinetic and potential energy effects, determine the mass flow rate of steam at inlet 2 if the mass flow rate of liquid water at inlet 1 is given as 2 kg/s.
Answers: 3
question
Engineering, 04.07.2019 19:10
The proportional limit is always greater than the yield strength for a material. a)-trune b)- false
Answers: 3
You know the right answer?
The granularsoil will be compacted in the excavation made at the building site (i. e., a rectangular...
Questions
Questions on the website: 13722363