A high strength waste having an ultimate CBOD of 1,000 mg/L is discharged to a river at a rate of 2 m3 /s. The river has an ultimate CBOD of 10 mg/L and is flowing at a rate of 8 m3 /s. Assuming a reaction rate coefficient of 0.1/day, calculate the ultimate and 5-day CBOD of the waste at the point of discharge (0 km) and 20 km downstream. The river is flowing at a velocity of 10 km/day.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 16:10
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
question
Engineering, 04.07.2019 18:10
Aplate clutch has a single pair of mating friction surfaces 250-mm od by 175-mm id. the mean value of the coefficient of friction is 0.30, and the actuating force is 4 kn. a) find the maximum pressure and the torque capacity using the uniform-wear model. b) find the maximum pressure and the torque capacity using the uniform-pressure model.
Answers: 3
question
Engineering, 04.07.2019 18:10
Determine whether or not it is possible to compress air adiabatically from k to 140 kpa and 400 k. what is the entropy change during this process?
Answers: 3
question
Engineering, 04.07.2019 18:10
Which of the following controllers anticipates the future from the slope of errors over time? a)-proportional b)-on/off c)-integral d)-derivative.
Answers: 2
You know the right answer?
A high strength waste having an ultimate CBOD of 1,000 mg/L is discharged to a river at a rate of 2...
Questions
question
Social Studies, 29.08.2019 01:30
question
Chemistry, 29.08.2019 01:30
Questions on the website: 13722362