subject
Engineering, 03.11.2020 08:10 johnthienann58

If 40 men build 4 buildings in 12 months, how many men would be required to build 6 houses in 4 months? Plz with formula

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The thermal expansion or contraction of a given metal is a function of the f a)-density b)-initial temperature c)- temperature difference d)- linear coefficient of thermal expansion e)- final temperature f)- original length
Answers: 2
question
Engineering, 04.07.2019 18:20
How much power could a wind turbine produce if it had the following specifications? cp = 0.45 -d=1.2kg/m3 d=50m v 5m/s
Answers: 2
question
Engineering, 04.07.2019 19:20
Determine (a) the maximum thermal efficiency of reversible power cycles operating between a hot reservoir at 1000°c and a cold reservoir at 200°c and (b) the maximum cops for reversible refrigeration and heat pump cycies, respectively, between 28°c and 14°c.
Answers: 1
question
Engineering, 04.07.2019 19:20
Determine the stoichiometric and actual air-fuel ratios and the mole flue gas composition for combustion with 15% excess air for raw indiana, pennsylvania raw coal.
Answers: 3
You know the right answer?
If 40 men build 4 buildings in 12 months, how many men would be required to build 6 houses in 4 mont...
Questions
question
English, 19.02.2021 03:30
question
Mathematics, 19.02.2021 03:30
Questions on the website: 13722361