subject
Engineering, 10.11.2020 08:50 joslyn96

(20 points) {brainliest} pls helpp Manufacturing processes involve several types of waste. Which methodology seeks to reduce all types of waste to improve efficiency?

A. Six Sigma
B. Just-in-time production
C. Agile project management
D. Lean manufacturing

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Abrake has a normal braking torque of 2.8 kip in and heat-dissipating cast-iron surfaces whose mass is 40 lbm. suppose a load is brought to rest in 8.0 s from an initial angular speed of 1600 rev/min using the normal braking torque; estimate the temperature rise of the heat dissipating surfaces.
Answers: 3
question
Engineering, 04.07.2019 18:10
A-mn has a cubic structure with a0 0.8931 nm and a density of 7.47 g/cm3. b-mn has a different cubic structure, with a0 0.6326 nm and a density of 7.26 g/cm3. the atomic weight of manganese is 54.938 g/mol and the atomic radius is 0.112 nm. determine the percent volume change that would occur if a-mn transforms to b-mn.
Answers: 2
question
Engineering, 04.07.2019 18:10
Machinery that is a key part of the process and without which the plant or process cannot function is classifed as: (clo4) a)-critical machinery b)-essential machinery c)-general purpose machinery d)-none of the specified options.
Answers: 1
question
Engineering, 04.07.2019 18:20
Agas mixture consists of 8 kmol of h2 and 2 kmol of n2. determine the mass of each gas and the apparent gas constant of the mixture.
Answers: 3
You know the right answer?
(20 points) {brainliest} pls helpp Manufacturing processes involve several types of waste. Which me...
Questions
question
English, 02.11.2020 17:00
question
Physics, 02.11.2020 17:00
question
Mathematics, 02.11.2020 17:00
question
Mathematics, 02.11.2020 17:00
Questions on the website: 13722363