subject
Engineering, 12.11.2020 19:10 lylesparks2791

A private foundation wants to estimate the construction cost of building a library in Miami, Florida in the year 2008. A similar project that the foundation funded in 1998 in Chicago, Illinois cost $105 per SF. However, the Miami library is expected to be 40% larger than the one in Chicago. Assuming a capacity factor of 0.8, what will the new library cost?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Explain the difference laminar and turbulent flow. explain it with the shear stress and the velocity profiles.
Answers: 1
question
Engineering, 03.07.2019 14:10
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
question
Engineering, 04.07.2019 18:10
Adouble-strand no. 60 roller chain is used to transmit power between a 13-tooth driving sprocket rotating at 300 rev/min and a 52-tooth driven sprocket. a) what is the allowable horsepower of this drive? b) estimate the center-to-center distance if the chain length is 82 pitches. c) estimate the torque and bending force on the driving shaft by the chain if the actual horsepower transmitted is 30 percent less than the corrected (allowable) power.
Answers: 3
question
Engineering, 04.07.2019 18:10
Manometers are good examples of measuring instruments, nowadays they are not as common as before. a)-capacitive probe gauges b)-gravitational gauges deformation ) gauges d)-digital gauges
Answers: 1
You know the right answer?
A private foundation wants to estimate the construction cost of building a library in Miami, Florida...
Questions
question
Mathematics, 30.07.2019 07:30
Questions on the website: 13722361