subject
Engineering, 13.11.2020 19:10 db328

HELP TIMED 2 MIN LEFT Explain what Sam can do to fix his engine in the following scenario.

Situation: Sam tried out a new hobby and rebuilt a car from scratch. When he got to the crankshaft, he was careful to attach it to the camshaft with the gears. He also made sure that the pistons were tightly attached to the crankshaft gears as well. It was also held in place by a series of journals. Finally, he made sure that the belt was in place on one side of the crankshaft. When James came over to look at the car, he noticed that Sam's crankshaft was still incomplete.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Ariver flows from north to south at 8 km/h. a boat is to cross this river from west to east at a speed of 20 km/h (speed of the boat with respect to the earth/ground). at what angle (in degrees) must the boat be pointed upstream such that it will proceed directly across the river (hint: find the speed of the boat with respect to water/river)? a 288 b. 21.8 c. 326 d. 30.2
Answers: 3
question
Engineering, 04.07.2019 18:10
Ajournal bearing has a journal diameter of 3.250 in with a unilateral tolerance of 20.003 in. the bushing bore has a diameter of 3.256 in and a unilateral tolerance of 0.004 in. the bushing is 2.8 in long and supports a 700-lbf load. the journal speed is 900 rev/min. find the minimum oil film thickness and the maximum film pressure for both sae 20 and sae 20w-30 lubricants, for the tightest assembly if the operating film temperature is 160°f. a computer code is appropriate for solving this problem.
Answers: 3
question
Engineering, 04.07.2019 18:10
Assuming compressible flow of air and that the measurements are done at flagstaff a pitot static tube that gives the difference of total and static pressure measures 0.35 m of mercury. what is the velocity of air? assume the temperature to be 300k. (submit your excel or matlab calculation sheet)
Answers: 1
question
Engineering, 04.07.2019 18:10
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
You know the right answer?
HELP TIMED 2 MIN LEFT Explain what Sam can do to fix his engine in the following scenario.
Questions
question
Computers and Technology, 26.11.2020 01:00
question
English, 26.11.2020 01:00
question
Health, 26.11.2020 01:00
question
Biology, 26.11.2020 01:00
question
Mathematics, 26.11.2020 01:00
Questions on the website: 13722363