subject
Engineering, 16.11.2020 17:00 Hudman57

A Y-connected of three identical 100-kVA 7967/277 V transformers is supplied with power directly from a large constant-voltage bus. In the short-circuit test, the recorded values on the high- voltage side for one of these transformers are: VSC = 560 V ISC = 12.6 A PSC = 3300 W (a) If this bank delivers a rated load at 0.88 PF lagging and rated voltage, what is the line-to-line voltage on the primary of the transformer bank?(b) What is the voltage regulation under these conditions?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The thermal expansion or contraction of a given metal is a function of the f a)-density b)-initial temperature c)- temperature difference d)- linear coefficient of thermal expansion e)- final temperature f)- original length
Answers: 2
question
Engineering, 04.07.2019 18:10
You are making beer. the first step is filling the glass carboy with the liquid wort. the internal diameter of the carboy is 15 in., and you wish to fill it up to a depth of 2 ft. if your wort is drawn from the kettle using a siphon process that flows at 3 gpm, how long will it take to fill?
Answers: 1
question
Engineering, 04.07.2019 18:20
Inspection for bearing condition will include: (clo4) a)-color b)-smell c)-size d)-none of the above
Answers: 1
question
Engineering, 04.07.2019 18:20
Find the minimum film thickness for a journal bearing with the data below. shaft diameter, d-50 mm, clearance ratio, cdratio? 0.001, shaft speed, n 2000 rpm; bearing length. i 200 mm; eccentricity ration, ? -0.55. ( note, cdratio-ca/d) the minimum film thickness is um
Answers: 2
You know the right answer?
A Y-connected of three identical 100-kVA 7967/277 V transformers is supplied with power directly fro...