subject
Engineering, 16.11.2020 18:00 lllamasarebae3061

Two rectangular clarifiersâeach 30 ft long and 15 ft wide with a water depth of 10 ftâsettle 0.40 mgd following alum coagulation. The effluent channels have a total weir length of 60 ft. Calculate the detention time, horizontal velocity of flow, and rate of flow over the outlet weirs. Do these values meet the Standards for Water Works?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Calculate the bore of a cylinder that has a stroke of 18 inches and an extension time of 6 seconds at a flow rate of 4 gal/min.
Answers: 3
question
Engineering, 04.07.2019 18:20
Select any two (2) areas of applications of chain-drive. (clo4) a)-permanent lubrication necessary b)-hydraulic forklift truck operation c)-rigging and heavy moving materials d)-relatively high maintenance costs e)-costlier than belt drives
Answers: 2
question
Engineering, 04.07.2019 18:20
What is the heat treatment of metals? what is the benefit of it? why and how it's useful? answer in details, do not write by hand.
Answers: 3
question
Engineering, 04.07.2019 18:20
Aheavily insulated piston-cylinder device contains 0.02 m3 of steam at 300 kpa and 200 °c. 1.2 mpa. d this process. team is now compressed in a reversible manner to a pressure of etermine the entropy change and the work done on the steam during this process
Answers: 1
You know the right answer?
Two rectangular clarifiersâeach 30 ft long and 15 ft wide with a water depth of 10 ftâsettle 0.40 mg...
Questions
question
Chemistry, 27.11.2021 01:00
question
Mathematics, 27.11.2021 01:00
Questions on the website: 13722362