subject
Engineering, 22.11.2020 14:00 Emiann222

What differentiates the master builder approach prior to the Renaissance from later approaches? Projects do not depend on individual knowledge but leverage the total knowledge of the team. The engineering and construction roles dominated projects because architectural designs were so simple. The architect and engineer roles are clearly separated into separate project phases. Knowledge is confined to particular individuals and not shared or formalized into a recognizable set of standards.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 19:30
When using the ohmmeter function of a digital multimeter, the leads are placed in what position relative to the component being tested? a. parallel b. control c. series d. line
Answers: 3
question
Engineering, 04.07.2019 18:10
Draw the engineering stress-strain curve for (a) bcc; (b) fcc metals and mark important points.
Answers: 1
question
Engineering, 04.07.2019 18:20
Inspection for bearing condition will include: (clo4) a)-color b)-smell c)-size d)-none of the above
Answers: 1
question
Engineering, 04.07.2019 18:20
Asimple rankine cycle uses water as the working fluid. the water enters the turbine at 10 mpa and 480c while the condenser operates at 6 kpa. if the turbine has an isentropic efficiency of 80 percent while the pump has an isentropic efficiency of 70 percent determine the thermal efficiency
Answers: 1
You know the right answer?
What differentiates the master builder approach prior to the Renaissance from later approaches? Proj...
Questions
question
English, 01.10.2019 11:30
question
Social Studies, 01.10.2019 11:30
Questions on the website: 13722362