subject
Engineering, 25.11.2020 21:40 levidenim08

If it took 2 hours to clean 4 houses how many houses could be cleaned in 3 hours

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 08:10
Which of the following is an easy way to remember the modified β€œx” tire rotation? a. nondrive wheels straight, cross the drive wheels b. drive wheels straight, cross the nondrive wheels c. drive wheels crossed, nondrive wheels straight d. drive wheels crossed, nondrive wheels crossed
Answers: 1
question
Engineering, 04.07.2019 12:10
On a average work day more than work place firs are reorted
Answers: 1
question
Engineering, 04.07.2019 18:10
An ideal otto cycle with air as the working fluid has a compression ratio of 8. the minimum and maximum temperatures in the cycle are 300 k and 1340 k. use constant specific heats at room temperature to determine (a) the amount of heat transferred to the air during the heat- addition kj/kg, (b) the thermal efficiency, and (c) the thermal efficiency of a carnot cycle ope limits. process, in rating between the same temperature
Answers: 2
question
Engineering, 04.07.2019 18:10
Machinery that is a key part of the process and without which the plant or process cannot function is classifed as: (clo4) a)-critical machinery b)-essential machinery c)-general purpose machinery d)-none of the specified options.
Answers: 1
You know the right answer?
If it took 2 hours to clean 4 houses how many houses could be cleaned in 3 hours...
Questions
question
Law, 30.10.2020 01:00
question
Mathematics, 30.10.2020 01:00
question
Business, 30.10.2020 01:00
question
History, 30.10.2020 01:00
question
Health, 30.10.2020 01:00
question
Mathematics, 30.10.2020 01:00
question
Biology, 30.10.2020 01:00
question
Mathematics, 30.10.2020 01:00
Questions on the website: 13722361