Engineering, 30.11.2020 03:50 mattotto1758

A heating system, a lightning, and a motor load circuit of a small warehouse establish an 18-KVA power demand at 0.487 power factor lagging on a 220 V, 60 Hz supply. a) Establish the power triangle for the load. b) Determine the power factor capacitor that must be place in parallel with the load to raise the power factor to 0.865 lagging. c) Determine the change in supply current from the uncompensated to the compensated system d) Determine the power factor capacitor that must be placed in parallel with the load to raise the power factor to unity

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Line joining liquid phase with liquid and solid phase mixture is known as: a) liquidus b) solidus c) tie line d) none of the mentioned
Answers: 2
question
Engineering, 04.07.2019 18:10
Journeyman training is usually related (clo2) a)-to specific tasks b)-to cost analysis of maintenance task c)-to control process to ensure quality d)-to installation of machinery
Answers: 2
question
Engineering, 04.07.2019 19:10
What is the chief metrological difference between measuring with a microscope and with an electronic comparator? a. the microscope is limited to small workpieces.a. the microscope is limited to small workpieces. c. the comparator can only examine one point on the workpiece. d. the microscope carries its own standard.
Answers: 1
question
Engineering, 06.07.2019 03:10
What is the direction and how to operate the lathe?
Answers: 2
You know the right answer?
A heating system, a lightning, and a motor load circuit of a small warehouse establish an 18-KVA pow...
Questions
question
Mathematics, 04.09.2020 14:01
question
English, 04.09.2020 14:01
question
History, 04.09.2020 14:01
question
Geography, 04.09.2020 14:01
question
History, 04.09.2020 14:01
question
Spanish, 04.09.2020 14:01
Questions on the website: 13722363