In which phase and for what purpose does a construction manager work with various consultants? In the [blank] phase, a construction manager works closely with architects, civil engineers, electrical engineers, and other consultants to prepare a [blank]. Choices for first [blank]
A. design and planning
B. Construction
C. Post construction

Choices for second [blank]
A. draft
B. Sketch
C. Blueprint

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
question
Engineering, 04.07.2019 18:20
Select any two (2) areas of applications of chain-drive. (clo4) a)-permanent lubrication necessary b)-hydraulic forklift truck operation c)-rigging and heavy moving materials d)-relatively high maintenance costs e)-costlier than belt drives
Answers: 2
question
Engineering, 04.07.2019 18:20
Inspection for bearing condition will include: (clo4) a)-color b)-smell c)-size d)-none of the above
Answers: 1
question
Engineering, 04.07.2019 18:20
Air flows over a heated plate Ă t a velocity of 50m/s. the local skin factor coefficient at a point on a plate is 0.004. estimate the local heat transfer coefficient at this point.the following property data for air are given: density = 0.88kg/m3 , viscosity 2.286 x 10 ^-5 kgm/s , k = 0.035w/mk ,cp = 1.001kj/kgk. use colburn reynolds analogy.
Answers: 1
You know the right answer?
In which phase and for what purpose does a construction manager work with various consultants? In th...
Questions
Questions on the website: 13722359