subject
Engineering, 01.12.2020 01:00 Gearyjames8

Select the correct answer from each drop-down menu. James is a building contractor and needs to decide at what depth he should lay the foundation. What information will he require?
James would have to determine the ( materials to be used, number of workers available, load bearing capacity of the soil)
and the (design of the building, availability of machines, amount to be spent)
to decide at what depth he should lay the foundation.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Line joining liquid phase with liquid and solid phase mixture is known as: a) liquidus b) solidus c) tie line d) none of the mentioned
Answers: 2
question
Engineering, 04.07.2019 12:10
On a average work day more than work place firs are reorted
Answers: 1
question
Engineering, 04.07.2019 18:10
Coiled springs ought to be very strong and stiff. si3n4 is a strong, stiff material. would you select this material for a spring? explain.
Answers: 2
question
Engineering, 04.07.2019 18:10
Shafts are machine elements that are used to a) carry axial loads b) direct shear loads c) transmit power d) rotate at constant speed e) none of the above circular and square shafts subjected to the same torque under the same circum behave a) the same way b) almost the same way
Answers: 2
You know the right answer?
Select the correct answer from each drop-down menu. James is a building contractor and needs to dec...
Questions
question
English, 21.01.2022 19:50
question
Mathematics, 21.01.2022 19:50
question
Mathematics, 21.01.2022 19:50
question
Mathematics, 21.01.2022 20:00
question
English, 21.01.2022 20:00
Questions on the website: 13722361