Minutes per unit Workstation HiFi-1 HiFi-2
1 6 4
2 5 5
3 4 6
The daily maintenance for stations 1, 2, and 3 consumes 10%, 14%, and 12%, respectively,
of the maximum 480 minutes available for each station each day. Determine the optimal
product mix that will minimize the idle (or unused) times in the three workstations.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Refrigerant 134a enters an insulated compressor operating at steady state as saturated vapor at -26°c with a volumetric flow rate of 0.18 m3/s. refrigerant exits at 9 bar, 70°c. changes in kinetic and potential energy from inlet to exit can be ignored. determine the volumetric flow rate at the exit, in m3/s, and the compressor power, in kw.
Answers: 1
question
Engineering, 04.07.2019 18:10
Manometers are good examples of measuring instruments, nowadays they are not as common as before. a)-capacitive probe gauges b)-gravitational gauges deformation ) gauges d)-digital gauges
Answers: 1
question
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
question
Engineering, 04.07.2019 18:10
Calculate the bore of a cylinder that has a stroke of 18 inches and an extension time of 6 seconds at a flow rate of 4 gal/min.
Answers: 3
You know the right answer?
Minutes per unit Workstation HiFi-1 HiFi-2
1 6 4
2 5 5
3 4 6
The daily maintena...
Questions
question
Mathematics, 12.03.2021 23:20
question
Mathematics, 12.03.2021 23:20
question
Geography, 12.03.2021 23:20
question
Mathematics, 12.03.2021 23:20
Questions on the website: 13722363