subject
Engineering, 05.12.2020 01:00 melikefood01

1. For the floor plans below multiple the length x width X depth for find the cubic feet (V) of concrete needed. Use the depth of .34 ft.
8 ft
V = length x width X depth

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Explain the difference laminar and turbulent flow. explain it with the shear stress and the velocity profiles.
Answers: 1
question
Engineering, 03.07.2019 14:10
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
question
Engineering, 04.07.2019 18:10
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
question
Engineering, 04.07.2019 18:10
Manometers are good examples of measuring instruments, nowadays they are not as common as before. a)-capacitive probe gauges b)-gravitational gauges deformation ) gauges d)-digital gauges
Answers: 1
You know the right answer?
1. For the floor plans below multiple the length x width X depth for find the cubic feet (V) of con...
Questions
question
Mathematics, 23.04.2021 20:50
question
Spanish, 23.04.2021 20:50
question
Mathematics, 23.04.2021 20:50
question
Mathematics, 23.04.2021 20:50
question
Mathematics, 23.04.2021 20:50
Questions on the website: 13722367