Engineering, 06.12.2020 23:30 danielcano1228
There are seven steps in the engineering design process. Why is it important that the engineer not skip a step?
A. Not skipping steps ensures that the best possible design is chosen and developed.
B. Without completing all the steps, nothing would ever be approved by the government.
C. It is illegal to skip a step.
D. Since there is a team of employees, a skipped step can mean that someone will not be compensated for his or her role in the project
Answers: 1
Engineering, 04.07.2019 18:10
Burgers vector is generally parallel to the dislocation line. a)-true b)-false
Answers: 2
Engineering, 04.07.2019 18:10
Which of the following refers to refers to how well the control system responds to sudden changes in the system. a)-transient regulation b)- distributed regulation c)-constant regulation d)-steady-state regulation
Answers: 1
Engineering, 04.07.2019 18:10
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
Engineering, 04.07.2019 18:20
Steam enters a converging nozzle at 3.0 mpa and 500ยฐc with a at 1.8 mpa. for a nozzle exit area of 32 cm2, determine the exit velocity, mass flow rate, and exit mach number if the nozzle: negligible velocity, and it exits (a) is isentropic (b) has an efficiency of 94 percent
Answers: 2
There are seven steps in the engineering design process. Why is it important that the engineer not s...
Mathematics, 23.05.2020 09:59
Mathematics, 23.05.2020 09:59
Chemistry, 23.05.2020 09:59
Mathematics, 23.05.2020 09:59
Mathematics, 23.05.2020 09:59
Business, 23.05.2020 10:02
Mathematics, 23.05.2020 10:02
Social Studies, 23.05.2020 10:02