I need help with creating a Residual Valuation Calculation for a site I have chosen for my 'Office to Residential Conversion assignment' which is due on 18th December 2020. See the site details below: Chosen Site:-
Office for sale in Unit 10, Freeport Office Village, Braintree, Essex CM77
£550,000 (£240.91/sq. ft)
Purpose of site: Convert from its current use as an office to a residential building.
Assignment Tasks:
-Produce a detailed residual method valuation with references.
-Research comparable resale values or rental income that can be derived from the proposed development
-Demonstrate knowledge and understanding of the overall development process
-Create a development plan showing disposal and use, and design of the development

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
An air conditioning system consist of a 5 cm diameter pipe, operating at a pressure of 200 kpa. the air initially enters the pipe at 15°c with a velocity of 20 m/s and relative humidity of 80%. if the heat supply throughout the process is 960 w, determine the relative humidity and the temperature at the outlet
Answers: 3
question
Engineering, 04.07.2019 18:10
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
question
Engineering, 04.07.2019 19:10
Analyze the factors that influence the choice between the following pairs of processes to make the products indicated: i) sand casting versus die casting of an electric-motor housing ii) thread rolling versus machining of a bolt for high-strength application. (co3/c5)
Answers: 3
question
Engineering, 04.07.2019 19:20
To save energy, the air supply to a 2000 ft office has been shut off overnight and the room temperature has dropped to 40°f. in the morning, the thermostat is reset to 70°f and warm air at 120 f begins to flov in at 200ft'/min. the air is well mixed within the room, and an equal mass flow of air at room temperature (changing with time) is withdrawn through a return duct. the air pressure is nearly 1 atm everywhere. ignoring heat transfer with the surroundings and kinetic and potential energy effects, estimate how long it takes for the room temperature to reach 70°f. plot the room temperature as a function of time.
Answers: 1
You know the right answer?
I need help with creating a Residual Valuation Calculation for a site I have chosen for my 'Office t...
Questions
question
Mathematics, 27.04.2021 22:20
question
Mathematics, 27.04.2021 22:20
question
Geography, 27.04.2021 22:20
Questions on the website: 13722363