subject
Engineering, 17.12.2020 17:00 bransom4206

A hole drilled into a manufactured part is specified to have a diameter if 1.50 cm. Ten parts are sampled from a production run, and the average hole size is measured to be 1.57 cm. Is the average hole diameter measurement a better indicator of accuracy or precision of the drilling process.?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Afluid flows with a velocity field given by v=(x/t)i.. determine the local and convective accelerations when x=3 and t=1.
Answers: 2
question
Engineering, 04.07.2019 18:10
Ajournal bearing has a journal diameter of 3.250 in with a unilateral tolerance of 20.003 in. the bushing bore has a diameter of 3.256 in and a unilateral tolerance of 0.004 in. the bushing is 2.8 in long and supports a 700-lbf load. the journal speed is 900 rev/min. find the minimum oil film thickness and the maximum film pressure for both sae 20 and sae 20w-30 lubricants, for the tightest assembly if the operating film temperature is 160°f. a computer code is appropriate for solving this problem.
Answers: 3
question
Engineering, 04.07.2019 18:20
Vibration monitoring this technique uses the noise or vibration created by mechanical equipment and in seme cases by plant systems to detemine their actual condtion. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:20
The characteristic roots of a dynamic system are: 1.7920 1.8160 i, -1.7920 1.8160 i, -0.4160 what is the order of this system? what are the settling time and damping ratio of the system?
Answers: 3
You know the right answer?
A hole drilled into a manufactured part is specified to have a diameter if 1.50 cm. Ten parts are sa...
Questions
question
Mathematics, 04.06.2021 17:10
question
Mathematics, 04.06.2021 17:10
question
Mathematics, 04.06.2021 17:10
question
Mathematics, 04.06.2021 17:10
question
Mathematics, 04.06.2021 17:10
question
Mathematics, 04.06.2021 17:10
Questions on the website: 13722363