A fairly large smooth asphalt parking lot adjacent to a shopping mall in the northern California city of Red Bluff has been constructed with an average slope of 0.5% and a maximum distance from the parking lot boundary to the runoff collection outlet of 90 meters. The 2-year, 24-hour rainfall estimate is slightly under 2-inches. Determine the time of concentration (t_c) using the following methods: a) Kerby Method
b) NRCS Watershed Lag Method
c) Overton-Meadows Method

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
If a particle moves along a path such that r : (3 sin t) m and ? : 2t rad, where t is in seconds. what is the particle's acceleration in m/s in 4 seconds? a)- 16.43 b)- 16.29 c)- 15.21 d)- 13.79
Answers: 1
question
Engineering, 04.07.2019 18:10
Acompressor receives the shaft work to decrease the pressure of the fluid. a)- true b)- false
Answers: 3
question
Engineering, 04.07.2019 18:10
Determine whether or not it is possible to compress air adiabatically from k to 140 kpa and 400 k. what is the entropy change during this process?
Answers: 3
question
Engineering, 04.07.2019 18:10
Aturning operation is performed with following conditions: rake angle of 12°, a feed of 0.35 mm/rev, and a depth of cut of 1.1 mm. the work piece is aluminum alloy 6061 with t6 heat treatment (a16061-t6). the resultant chip thickness was measured to be 1.0 mm. estimate the cutting force, fc. use shear stress of 207 mpa and coefficient of friction on the tool face of 0.6.
Answers: 1
You know the right answer?
A fairly large smooth asphalt parking lot adjacent to a shopping mall in the northern California cit...
Questions
question
Mathematics, 22.08.2019 00:20
Questions on the website: 13722361