An HVAC contracting company sent out three work crews to complete three installations over the past week. If Crew One worked 10-, 9-, 11-, 12-, and 9-hour
days, Crew Two worked 9-, 12-, 12-,9-, and 9-hour days, and Crew Three worked
12-, 12-, 10-, 9-, and 11-hour days, how many total hours did the three crews work
for the week?

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 12:10
On a average work day more than work place firs are reorted
Answers: 1
question
Engineering, 04.07.2019 18:10
Ariver flows from north to south at 8 km/h. a boat is to cross this river from west to east at a speed of 20 km/h (speed of the boat with respect to the earth/ground). at what angle (in degrees) must the boat be pointed upstream such that it will proceed directly across the river (hint: find the speed of the boat with respect to water/river)? a 288 b. 21.8 c. 326 d. 30.2
Answers: 3
question
Engineering, 04.07.2019 18:10
Ajournal bearing has a journal diameter of 3.250 in with a unilateral tolerance of 20.003 in. the bushing bore has a diameter of 3.256 in and a unilateral tolerance of 0.004 in. the bushing is 2.8 in long and supports a 700-lbf load. the journal speed is 900 rev/min. find the minimum oil film thickness and the maximum film pressure for both sae 20 and sae 20w-30 lubricants, for the tightest assembly if the operating film temperature is 160°f. a computer code is appropriate for solving this problem.
Answers: 3
question
Engineering, 04.07.2019 18:10
Draw the engineering stress-strain curve for (a) bcc; (b) fcc metals and mark important points.
Answers: 1
You know the right answer?
An HVAC contracting company sent out three work crews to complete three installations over the past...
Questions
question
Mathematics, 13.04.2021 01:40
question
Mathematics, 13.04.2021 01:40
question
Biology, 13.04.2021 01:40
Questions on the website: 13722360