subject
Engineering, 22.12.2020 23:00 ajaydonlee

Steam enters the turbine at 8 MPa and 480 oC and expands to 0.7 MPa where some of the steam is extracted and diverted to the open feed water heater operating at 0.7 MPa. The remaining steam expands through the second stage turbine to the condenser pressure of 10 kPa. Saturated liquid water exists from the open feed water heater at 0.7 MPa. The isentropic efficiency of the each turbine is 85%. If the net power output of the cycle is 120 MW, determine a) the thermal efficiency and, b) the mass flow rate of steam entering the first stage of turbine

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 16:10
An electrical motor raises a 50kg load at a construct velencity .calculate the power of the motor, if it takes 40sec to raise the load through a height of 24m(take g =9.8n/g)
Answers: 2
question
Engineering, 04.07.2019 18:10
Aloaded platform of total mass 500 kg is supported by a dashpot and by a set of springs of effective stiffness 72 kn/m. it is observed that when the platform is depressed through a distance x = 12.5 cm below its equilibrium position and then released without any initial velocity; it reaches its equilibrium position in the shortest possible time without overshoot. find the position and velocity of the loaded platform 0.10 sec. after its release. if a further load of 400 kg is added to the platform, find, i) the frequency of damped vibrations, and i) the amplitude of vibration after 2 complete oscillations, given that the initial amplitude is 15 cm.
Answers: 1
question
Engineering, 04.07.2019 18:10
Ariver flows from north to south at 8 km/h. a boat is to cross this river from west to east at a speed of 20 km/h (speed of the boat with respect to the earth/ground). at what angle (in degrees) must the boat be pointed upstream such that it will proceed directly across the river (hint: find the speed of the boat with respect to water/river)? a 288 b. 21.8 c. 326 d. 30.2
Answers: 3
question
Engineering, 04.07.2019 18:10
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
You know the right answer?
Steam enters the turbine at 8 MPa and 480 oC and expands to 0.7 MPa where some of the steam is extra...
Questions
question
Mathematics, 15.04.2021 05:00
question
Mathematics, 15.04.2021 05:00
question
History, 15.04.2021 05:00
question
Mathematics, 15.04.2021 05:00
question
Mathematics, 15.04.2021 05:00
question
Mathematics, 15.04.2021 05:00
question
Mathematics, 15.04.2021 05:00
Questions on the website: 13722363