During variable control charting a trend of four consecutive points is noted on both the
average and range charts. The average chart is
increasing and the range chart is decreasing.
One may make which of the following
conclusions?
a. No conclusions may be made yet
b. The nominal measurement is increasing
c. The variability is decreasing
d. The process is improving

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Afull journal bearing has a journal diameter of 27 mm, with a unilateral tolerance of -0.028 mm. the bushing bore has a diameter of 27.028 mm and a unilateral tolerance of 0.04 mm. the l/d ratio is 0.5. the load is 1.3 kn and the journal runs at 1200 rev/min. if the average viscosity is 50 mpa-s, find the minimum film thickness, the power loss, and the side flow for the minimum clearance assembly.
Answers: 1
question
Engineering, 04.07.2019 18:10
Assuming compressible flow of air and that the measurements are done at flagstaff a pitot static tube that gives the difference of total and static pressure measures 0.35 m of mercury. what is the velocity of air? assume the temperature to be 300k. (submit your excel or matlab calculation sheet)
Answers: 1
question
Engineering, 04.07.2019 18:20
Vibration monitoring this technique uses the noise or vibration created by mechanical equipment and in seme cases by plant systems to detemine their actual condtion. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 19:10
What is the main objective of using reheat rankine cycle?
Answers: 3
You know the right answer?
During variable control charting a trend of four consecutive points is noted on both the
avera...
Questions
question
Mathematics, 30.01.2020 17:52
question
Mathematics, 30.01.2020 17:52
question
Biology, 30.01.2020 17:52
question
Biology, 30.01.2020 17:52
Questions on the website: 13722363