A compacted fill is to be constructed to support a new highway. The fill material will be taken from a location (“borrow pit”) where the in-place dry unit weight is 105 pcf and the water content is 9%. The soil will be excavated from the borrow pit, moistened to increase the water content to 13.5% and then compacted to a final dry unit weight of 118 pcf. The total final volume of the compacted fill will be 250,000 yd3.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The mass flow rate of the fluid remains constant in all steady flow process. a)- true b)- false
Answers: 1
question
Engineering, 04.07.2019 18:10
Which of the following controllers anticipates the future from the slope of errors over time? a)-proportional b)-on/off c)-integral d)-derivative.
Answers: 2
question
Engineering, 04.07.2019 18:20
For each of the following process: a) sketch the p-v diagram, b)sketch t-s diagram, c) sketch t-v diagram, d) sketch the boundary work on one of the diagrams (a, b or c) and e) sketch the reversible heat transfer on one of the diagrams (a, b or c): 1- isobaric process from compressed liquid to superheated vapor 2- isothermal process from compressed liquid to superheated vapor 3- isentropic process from compressed liquid to superheated vapor
Answers: 3
question
Engineering, 04.07.2019 19:10
What is creep? what is stress relaxation?
Answers: 1
You know the right answer?
A compacted fill is to be constructed to support a new highway. The fill material will be taken from...
Questions
question
Mathematics, 29.01.2020 15:02
Questions on the website: 13722360