subject
Engineering, 26.01.2021 07:10 rue61

B. Directions: For items 9-15, sequence the steps involved on how to accomplish the form in order to acquire materials. Write letters a lo h on the blank, 'a' being the
first step, and so on. Do this in your Activity Notebook.
8. Write your name as requisitioner
9. List the cost per unit and the total cost.
10. Write the number of required materials.
11. List the unit of materials to be requisitioned.
12. Secure the approval of the supply officer.
13. Enumerate the materials with their description.
1.4. State the name of the project and date when you requested for materials.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
Explain the difference laminar and turbulent flow. explain it with the shear stress and the velocity profiles.
Answers: 1
question
Engineering, 04.07.2019 03:10
What precautions should you take to prevent injuries when dealing with heavy loads?
Answers: 1
question
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
question
Engineering, 04.07.2019 18:10
Ahot wire operates at a temperature of 200°c while the air temperature is 20°c. the hot wire element is a tungsten wire of 5 um diameter and 2 mm in length. plot using excel current, heat transfer and heat generated by the wire for air velocity varying from 1-10 m/s in steps of lm/s? matlab the sensor voltage output, resistance, or assume nu 0.989 re033pr13 take air properties at tr (200°c20°c)/2 = 110°c properties of tungsten: c 0.13 kj/kg.k 3 p 19250 kg/m k (thermal conductivity) = 174 w/m.k
Answers: 2
You know the right answer?
B. Directions: For items 9-15, sequence the steps involved on how to accomplish the form in order t...
Questions
question
English, 13.01.2021 20:40
question
English, 13.01.2021 20:40
Questions on the website: 13722367