subject
Engineering, 27.01.2021 20:30 lbelle

Name the quadrant or axis where each point lies. Point F: Choose One Point L: Choose One Point N: Choose One Point T: Choose One

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Items are similar to the free issue items, but their access is limited. (clo5) a)-bin stock items free issue b)-bin stock controlled issue c)-critical or insurance spares d)-rebuildable spares e)-consumables
Answers: 1
question
Engineering, 04.07.2019 18:10
Ahot wire operates at a temperature of 200°c while the air temperature is 20°c. the hot wire element is a tungsten wire of 5 um diameter and 2 mm in length. plot using excel current, heat transfer and heat generated by the wire for air velocity varying from 1-10 m/s in steps of lm/s? matlab the sensor voltage output, resistance, or assume nu 0.989 re033pr13 take air properties at tr (200°c20°c)/2 = 110°c properties of tungsten: c 0.13 kj/kg.k 3 p 19250 kg/m k (thermal conductivity) = 174 w/m.k
Answers: 2
question
Engineering, 04.07.2019 18:20
A3-mm-thick panel of aluminum alloy (k 177 w/m-k, c 875 j/kg-k and ? = 2770 kg/m) is finished on both sides with an epoxy coating that must be cured at or above t,-150°c for at least 5 min. the production line for the curing operation involves two steps: (1) heating in a large oven with air at ts,0-175°c and a convection coefficient of h, 40 w/m2. k, and (2) cooling in a large chamber with air at 25°c and a con- vection coefficient of he 10 w/m2.k. the heating portion of the process is conducted over a time interval te which exceeds the ime required to reach 150°c by 5 min (h = r + 300 s). the coating has an emissivity of ? = 0.8, and the temperatures of the oven and chamber walls are 175 and 25°c, respectively. if the panel is placed in the oven at an initial temperature of 25°c and removed from the chamber at a safe-to-touch tempera ture of 37°c, what is the total elapsed time for the two-step curing operation?
Answers: 3
question
Engineering, 06.07.2019 05:10
The ivanpah solar thermal power plant cost $2.2 billion to build. the gross plant electric output is 392 mw, and the net output is 377 mw. the planned capacity factor was 27.4%, but the actual capacity factor in 2016 was 20.5%. at best the plant thermal efficiency appears to be 18%. in addition, for the daily startup process, the solar plant also burned 1.3x10^12 btu of natural gas in 2016. the cost of natural gas in 2016 was about $2.5 per million btu. assuming a levelized annual fixed charge rate of 7%, determine (a) the capital cost (c/kwh) and (b) the fuel cost (e/k wh) for the electricity in 2016.
Answers: 3
You know the right answer?
Name the quadrant or axis where each point lies. Point F: Choose One Point L: Choose One Point N: Ch...
Questions
question
Mathematics, 14.12.2019 06:31
question
Mathematics, 14.12.2019 06:31
Questions on the website: 13722363