What problem of the low-bid process is the negotiated price process intended to solve? O The negotiated price process places a greater emphasis on lowering cost than the low-bid process.
The negotiated price process focuses on contractor qualifications instead of simply seeking the lowest-bidding contractor.
O The negotiated price process is easier to manage than the low-bid process.
O The negotiated price process is faster than the low-bid process.

ansver
Answers: 1

Another question on Engineering

question
Engineering, 04.07.2019 08:10
Which of the following is an easy way to remember the modified β€œx” tire rotation? a. nondrive wheels straight, cross the drive wheels b. drive wheels straight, cross the nondrive wheels c. drive wheels crossed, nondrive wheels straight d. drive wheels crossed, nondrive wheels crossed
Answers: 1
question
Engineering, 04.07.2019 18:10
Thermal stresses are developed in a metal when its a) initial temperature is changed b) final temperature is changed c) density is changed d) thermal deformation is prevented e) expansion is prevented f) contraction is prevented
Answers: 2
question
Engineering, 04.07.2019 18:10
The higher the astm grain-size number, the coarser the grain is. a)-true b)-false
Answers: 3
question
Engineering, 04.07.2019 18:10
Which of the following refers to refers to how well the control system responds to sudden changes in the system. a)-transient regulation b)- distributed regulation c)-constant regulation d)-steady-state regulation
Answers: 1
You know the right answer?
What problem of the low-bid process is the negotiated price process intended to solve? O The negoti...
Questions
question
Mathematics, 08.06.2021 05:00
question
Spanish, 08.06.2021 05:00
question
Mathematics, 08.06.2021 05:00
question
Geography, 08.06.2021 05:00
question
Mathematics, 08.06.2021 05:00
Questions on the website: 13722359