When preparing to begin a earth moving project that will require at least 2 years of site preparations and million tons of material has to be relocated and some blasting from solid rock
will be a part of the process. I have given you several steps that are required before and during
the process. Put them in order and give a short description of what work and preparation will
need to be completed in each step.
1. You will need to acquired the property and mineral rights or have a contract to perform
all said work described in the contract. Write down some considerations that are a must
happen before entering the property with a piece of equipment.
Call the wife and make plans for supper.
Call 811
Call the power company
Call an engineering firm.
Get in touch with the local fire department.
Get in touch with the highway department.
Get in touch with the county road department.
Check the weight limits on any bridges that have to be crossed with equipment our
trucks hauling materials.
Get in touch with the local hardware and set up an account.
Find an equipment dealership to purchase parts when needed to repair equipment.
Get in touch with the local unemployment office to set up a hiring event.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Adouble-strand no. 60 roller chain is used to transmit power between a 13-tooth driving sprocket rotating at 300 rev/min and a 52-tooth driven sprocket. a) what is the allowable horsepower of this drive? b) estimate the center-to-center distance if the chain length is 82 pitches. c) estimate the torque and bending force on the driving shaft by the chain if the actual horsepower transmitted is 30 percent less than the corrected (allowable) power.
Answers: 3
question
Engineering, 04.07.2019 18:10
Ajournal bearing has a journal diameter of 3.250 in with a unilateral tolerance of 20.003 in. the bushing bore has a diameter of 3.256 in and a unilateral tolerance of 0.004 in. the bushing is 2.8 in long and supports a 700-lbf load. the journal speed is 900 rev/min. find the minimum oil film thickness and the maximum film pressure for both sae 20 and sae 20w-30 lubricants, for the tightest assembly if the operating film temperature is 160°f. a computer code is appropriate for solving this problem.
Answers: 3
question
Engineering, 04.07.2019 18:10
The filament of an incandescent lamp has a temperature of 2000k. calculate the fraction of radiation emitted in the visible light band if the filament is approximated as blackbody
Answers: 2
question
Engineering, 04.07.2019 18:10
Consider a large isothermal enclosure that is maintained at a uniform temperature of 2000 k. calculate the emissive power of the radiation that emerges from a small aperture on the enclosure surface. what is the wavelength ? , below which 10% of the emission is concentrated? what is the wavelength ? 2 above which 10% of the emission is concentrated? determine the wavelength at which maximum spectral emissive power occurs. what is the irradiation incident on a small object placed inside the enclosure?
Answers: 2
You know the right answer?
When preparing to begin a earth moving project that will require at least 2 years of site preparati...
Questions
question
Mathematics, 11.02.2022 14:00
question
Mathematics, 11.02.2022 14:00
question
Mathematics, 11.02.2022 14:00
Questions on the website: 13722362