subject
Engineering, 16.02.2021 01:00 Artemis3821

A large V8 SI four-stroke cycle engine with a displacement of 4.6 liters is equipped with cylinder cutout, which converts the engine to a 2.3 liter V4 when less power is needed. At a speed of 1750 RPM the engine, as a V8, has a volumetric efficiency of 51%, a mechanical efficiency of 75%, an air-fuel ratio of 14.5, and produces 32.4 kW of brake power using gasoline. With cylinder cutout and operating at higher speed as a V4, the engine has a volumetric efficiency of 86%, a mechanical efficiency of 87%, and uses an air-fuel ratio of 18.2. Indicated thermal efficiency can be considered the same at all speeds, and assume combustion efficiency is 100%. Calculate:

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 03:10
What precautions should you take to prevent injuries when dealing with heavy loads?
Answers: 1
question
Engineering, 04.07.2019 18:10
Air is to be cooled in the evaporator section of a refrigerator by passing it over a bank of 0.8-cm-outer-diameter and 0.4-m-long tubes inside which the refrigerant is evaporating at -20°c. air approaches the tube bank in the normal direction at 0°c and 1 atm with a mean velocity of 4 m/s. the tubes are arranged in-line with longitudinal and transverse pitches of sl- st 1.5 cm. there are 30 rows in the flow direction with 15 tubes in each row. determine (a) the refrigeration capacity of this system and (b) pressure drop across the tube bank. evaluate the air properties at an assumed mean temperature of -5°c and 1 atm. is this a good assumption?
Answers: 1
question
Engineering, 04.07.2019 18:20
Water vapor initially at 10 bar and 400 °c is contained within a piston-cylinder assembly. the water lost heat to the surrounding according to isochoric (iso-volumetric) process until its temperature is 150 °c. the water is then condensed isothermally to saturated liquid. for the water as a system, calculate the work in kj/kg
Answers: 2
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
You know the right answer?
A large V8 SI four-stroke cycle engine with a displacement of 4.6 liters is equipped with cylinder c...
Questions
question
English, 19.10.2020 06:01
question
Social Studies, 19.10.2020 06:01
question
History, 19.10.2020 06:01
Questions on the website: 13722363