subject
Engineering, 19.02.2021 16:30 leo4687

A Palm Spring golf course has requested a permit to install a 40000 ft2 pond to enhance the beauty of its facilities. Since the evaporation rates are very high in Palm Springs, it is likely they will need to pump a lot of groundwater to keep the pond full. The city has hired you (a water resources engineer) to determine how much water needs to be pumped per year in order to keep the pond filled. There is a small creek that discharges an average of 0.25 m3/s into the pond. The outlet valve from the pond releases an average rate of 0.30 m3/s (to keep the pond from getting stagnant). Precipitation on the pond is 260 mm/year, and the annual evaporation is estimated to be 105 inches/year. The pond will be lined with concrete to prevent any drainage or seepage 36 from the bottom. Required:
a. Using a water balance, what volume (on average) of groundwater (in cubic meters) must be added to the lake each year to keep the pond at a constant level?
b. Draw a schematic of the problem to identify the control volume and the relevant fluxes. Clearly write out/define your water balance equation and variables along with any assumptions you make.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Give heat transfer applications for the following, (i) gas turbines (propulsion) ) gas turbines (power generation). (iii) steam turbines. (iv) combined heat and power (chp). (v) automotive engines
Answers: 1
question
Engineering, 04.07.2019 18:10
Condition monitoring is a major component of. (clo4) a)- predictive maintenance. b)-preventive maintenance c)-proactive maintenance d)-reactive maintenance.
Answers: 1
question
Engineering, 04.07.2019 18:10
Journeyman training is usually related (clo2) a)-to specific tasks b)-to cost analysis of maintenance task c)-to control process to ensure quality d)-to installation of machinery
Answers: 2
question
Engineering, 06.07.2019 03:10
An electrical kettle is made out of stainless steel,weighs two pounds (when empty) with a heating element that consumes 2 kw of electricity. assuming that the water and the kettle are at the same uniform temperature at any moment of time, calculate the shortest possible time to bring 2 quarts of water from room temperature to the onset of boiling.
Answers: 1
You know the right answer?
A Palm Spring golf course has requested a permit to install a 40000 ft2 pond to enhance the beauty o...
Questions
question
Mathematics, 12.12.2020 16:10
question
Mathematics, 12.12.2020 16:10
question
Mathematics, 12.12.2020 16:10
question
Social Studies, 12.12.2020 16:10
Questions on the website: 13722361