subject
Engineering, 23.02.2021 01:30 dinosaur10

Due to crashes at a railroad crossing in Salem, Oregon, an overpass (with a roadway surface 26 ft above the existing road) is to be constructed on an existing level highway. The existing highway has a design speed of 50 mi/h. The overpass structure is to be level, centered above the railroad, and 180 ft long. What length of the existing level highway must be reconstructed to provide an appropriate vertical alignment

ansver
Answers: 1

Another question on Engineering

question
Engineering, 03.07.2019 14:10
The y form of iron is known as: a) ferrite b) cementite c) perlite d) austenite
Answers: 3
question
Engineering, 04.07.2019 18:10
Steel is coated with a thin layer of ceramic to protect against corrosion. what do you expect to happen to the coating when the temperature of the steel is increased significantly? explain.
Answers: 1
question
Engineering, 04.07.2019 18:10
The filament of an incandescent lamp has a temperature of 2000k. calculate the fraction of radiation emitted in the visible light band if the filament is approximated as blackbody
Answers: 2
question
Engineering, 04.07.2019 18:20
What is the heat treatment of metals? what is the benefit of it? why and how it's useful? answer in details, do not write by hand.
Answers: 3
You know the right answer?
Due to crashes at a railroad crossing in Salem, Oregon, an overpass (with a roadway surface 26 ft ab...
Questions
question
Mathematics, 27.10.2020 04:10
question
Mathematics, 27.10.2020 04:10
question
Mathematics, 27.10.2020 04:10
question
Biology, 27.10.2020 04:10
Questions on the website: 13722361