A concrete block making company is developing an aggregate capacity plan from the following sales forecast for its 6” and 8” concrete blocks shown in the table below. Product Sales Forecasts (Concrete Blocks) 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter 6” Block 2,000 1,500 1,600 1,800 8” Block 1,200 1,000 800 1,000 Ample machine capacity exists to produce the forecast. Each 6” concrete block takes an average of 20 labour-hours while each 8” concrete block takes an average of 15 labour-hours. a) Compute the aggregate number of labour-hours in each quarter. b) If the plant works the same number of days in each quarter, 13 five-day weeks on a single shift, how many workers will be required in each quarter? c) It costs $1,000 to hire a worker and $500 to lay off a worker, and inventory carrying cost is $100 for each 6” concrete block and $100 for each 8” concrete block (this means that if one 6” concrete block were held in inventory for a year, it would cost $100 for finance charge, insurance, warehousing expense, etc.). The plant works the same number of days in each quarter, 13 five-day weeks. Assuming that the quarterly demand pattern repeats from year to year, compute the cost of each of the following two aggregate plans for next year: i. Chase strategy plan. Beginning inventory in this plan is zero for both types of concrete blocks. ii. Level strategy plan. Beginning inventory in this plan is 275 for 6” concrete blocks and 200 for 8” concrete blocks.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 14:10
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
question
Engineering, 04.07.2019 18:20
Most leaks in reciprocating air compressors can be detected and minimized by: (clo4) a)-detecting leakage areas using ultrasonic acoustic detector. b)-tightening joints and connections c)-replacing faulty equipment d)-all of the given options
Answers: 2
question
Engineering, 04.07.2019 19:10
An electric kettle is made out of stainless steel, weighs two pounds (when empty) and is equipped with a heating element that consumes 2 kw of electricity. assuming that the water and the kettle are at the same uniform temperature at any moment of time, calculate the shortest possible time to bring 2 quarts of water from room temperature to the onset of boiling
Answers: 2
question
Engineering, 06.07.2019 03:10
An electrical kettle is made out of stainless steel,weighs two pounds (when empty) with a heating element that consumes 2 kw of electricity. assuming that the water and the kettle are at the same uniform temperature at any moment of time, calculate the shortest possible time to bring 2 quarts of water from room temperature to the onset of boiling.
Answers: 1
You know the right answer?
A concrete block making company is developing an aggregate capacity plan from the following sales fo...