subject
Engineering, 03.03.2021 20:20 hwk4102

Please help ASAP!! Which type of control system requires engineers to analyze data before any corrective action occurs?

In contrast to automated control systems, a
is a type of control system in which engineers must first analyze a system's output and then decide if the system requires any adjustments.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:10
Acompressor receives the shaft work to decrease the pressure of the fluid. a)- true b)- false
Answers: 3
question
Engineering, 04.07.2019 18:10
Journeyman training is usually related (clo2) a)-to specific tasks b)-to cost analysis of maintenance task c)-to control process to ensure quality d)-to installation of machinery
Answers: 2
question
Engineering, 04.07.2019 19:10
Asteel wire of 2 mm diameter is fixed between two points located 2 m apart. the tensile force in the wire is 250n, if its density of steel is given by 7830 kg/m3 the fundamental frequency of vibration hz? ?
Answers: 3
question
Engineering, 04.07.2019 19:10
An electric kettle is made out of stainless steel, weighs two pounds (when empty) and is equipped with a heating element that consumes 2 kw of electricity. assuming that the water and the kettle are at the same uniform temperature at any moment of time, calculate the shortest possible time to bring 2 quarts of water from room temperature to the onset of boiling
Answers: 2
You know the right answer?
Please help ASAP!! Which type of control system requires engineers to analyze data before any corre...
Questions
question
Chemistry, 07.04.2021 17:20
Questions on the website: 13722363