A three-story structure is to be constructed over an 8000-m2 site. The initial subsurface exploration indicates the presence of sinkholes and voids due to dissolution of the limestone formation. The predominant soil type is a silty fine sand grading to a fine sand with seams of sandy clay. The design indicates that shallow foundations can be used for this project provided the soils were made more homogeneous as far as load support and no voids were present within the depth up to 7.6 m below the ground surface. Assume groundwater is not a concern. Dynamic compaction is proposed to improve the ground. The local contractor doing dynamic compaction has a 15-ton tamper with the diameter of 2.0 m and the height of 1.4 m. You are requested to conduct the preliminary design for this dynamic compaction project including drop height, spacing, number of drops, number of passes, estimated crater depth, and settlement

ansver
Answers: 3

Another question on Engineering

question
Engineering, 04.07.2019 18:10
The temperature of air decreases as it is compressed by an adiabatic compressor. a)- true b)- false
Answers: 2
question
Engineering, 04.07.2019 18:10
Water at 70°f and streams enter the mixing chamber at the same mass flow rate, determine the temperature and the quality of the exiting stream. 0 psia is heated in a chamber by mixing it with saturated water vapor at 20 psia. if both streams enters the mixing chamber at the same mass flow rate, determine the temperature and the quality of the existing system.
Answers: 2
question
Engineering, 04.07.2019 19:10
What is creep? what is stress relaxation?
Answers: 1
question
Engineering, 06.07.2019 02:30
Precipitation hardening can be achieved in many light alloys by a three-step heat treatment. what is carried out and what is the purpose at each step? why is such a treatment necessary based on the nucleation and growth theory of phase transformation. compare this treatment with tempering martensite for carbon steels (similarities and differences).