subject
Engineering, 13.03.2021 05:00 merunikitty1226

1. A drilling operation is to be performed with a 10 mm diameter twist drill in a steel workpart. The hole is a blind hole at a depth of 60 mm and the point angle is 118. The cutting speed is 30 m/min and the feed is 0.25 mm/rev. Determine (a) the cutting time to complete the drilling operation, and (b) metal removal rate during the operation, after the drill bit reaches full diameter.

ansver
Answers: 3

Another question on Engineering

question
Engineering, 03.07.2019 15:10
Ahouse has the following electrical appliance usage (1) single 40w lamp used for 4 hours per day (2) single 60w fan used for 12 hours per day (3) single 200w refrigerator that runs 24 hours per day with compressor run 12 hours and off 12 hours find the solar power inverter size in watt with correction factor of 1.25.
Answers: 1
question
Engineering, 04.07.2019 18:10
Carbon dioxide gas expands isotherm a turbine from 1 mpa, 500 k at 200 kpa. assuming the ideal gas model and neglecting the kinetic and potential energies, determine the change in entropy, heat transfer and work for each kilogram of co2.
Answers: 2
question
Engineering, 04.07.2019 18:20
Inadequate stores control is not an obstacle to effective work order system. (clo4) a)-true b)-false
Answers: 3
question
Engineering, 04.07.2019 18:20
Aquick transition of the operating speed of a shaft from its critical speed will whirl amplitude. (a) increase (b) limit (c) not affect (d) zero
Answers: 2
You know the right answer?
1. A drilling operation is to be performed with a 10 mm diameter twist drill in a steel workpart. Th...
Questions
question
Computers and Technology, 27.09.2020 14:01
question
English, 27.09.2020 14:01
question
Geography, 27.09.2020 14:01
question
Mathematics, 27.09.2020 14:01
question
History, 27.09.2020 14:01
question
Social Studies, 27.09.2020 14:01
Questions on the website: 13722367