subject
Engineering, 18.03.2021 01:30 Awesomedude1157

1. Defend the importance of communication in the software deployment process. 2. A beverage company is planning to market a new soft drink. Recommend the most effective way to test the product.

3.Explain why the scenario below fails to meet the definition of alpha testing.

An electronics company has mass-produced a product that has a major design flaw: a GPS that updates incorrectly when it switches time zones.
4. Explain why the scenario below fails to thoroughly complete the step of researching the problem, the second step in the engineering design phase.

Sam’s design team lists three product goals related to expense, safety, and construction. The team determines that parents of hockey players do not want to spend more than $50 on a helmet for their 10- to 12-year-old children.
5. Analyze the different kinds of engineering that went into the development of a familiar object, such as a cell phone.

6. Change the following minimally acceptable requirement into one that reflects an ideal value: The Pee Wee helmet needs to safely deflect high-impact pucks.

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
If the thermal strain developed in polyimide film during deposition is given as 0.0044. assume room temperature is kept at 17.3 c, and thermal coefficient of expansion for the film and the substrate are 54 x 10^-6c^-1 and 3.3 x 10^-6c^-1respectively. calculate the deposition temperature.
Answers: 3
question
Engineering, 04.07.2019 18:10
Ariver flows from north to south at 8 km/h. a boat is to cross this river from west to east at a speed of 20 km/h (speed of the boat with respect to the earth/ground). at what angle (in degrees) must the boat be pointed upstream such that it will proceed directly across the river (hint: find the speed of the boat with respect to water/river)? a 288 b. 21.8 c. 326 d. 30.2
Answers: 3
question
Engineering, 04.07.2019 18:10
The higher the astm grain size number, the finer the gran is. a)-true b)-false
Answers: 2
question
Engineering, 04.07.2019 18:10
What are the two (02) benefits, which may result from a successful implementation of preventive maintenance (pm) program in an organization? (clo3)a)- lean manufacturing b)-overlapping responsibilities c)-the planner is not qualified d)-accurate contractor information e)-reduction in equipment redundancies f)-accurate stores information
Answers: 3
You know the right answer?
1. Defend the importance of communication in the software deployment process. 2. A beverage company...
Questions
question
Spanish, 19.10.2019 05:30
question
English, 19.10.2019 05:30
question
Mathematics, 19.10.2019 05:30
question
Chemistry, 19.10.2019 05:30
Questions on the website: 13722367