subject
Engineering, 19.03.2021 18:10 ramirez5571

You are to separate an O2/CO2 stream using a membrane process. The membrane to be used is silicone rubber with a thickness of 2.54x10-3cm. The permeability of O2 in silicone rubber is 500x10-10 cm3STPcm/[sec cm2cmHg] at 25 0C. The permeability of CO2 in silicone rubber is 2700x10-10 cm3STPcm/[sec cm2cmHg] at 25 0C. The feed to be processed has a flowrate of 1x106cm3(STP)/s and is 85 mol% CO2. A) You would like to remove a concentrated permeate stream that is at least 95% CO2, in order to capture and store this CO2 rather than releasing it into the atmosphere. If the high pressure side is at 100 cmHg, the low pressure side at 20 cmHg, can 20% of the feed volume be removed as the permeate and meet the desired vapor phase composition? What area of membrane is needed to complete this separation?
B) What is the maximum percentage of the feed that can be pushed through the membrane as permeate product such that it has a composition (mole fraction) greater than 90% CO2?
C) A two stage separation is used, in which the permeate of stage 1 is repressurized to 100 cmHg and sent to a second stage. Both stages operate with a permeate pressure of 20 cmHg. If the cut of the first stage is 0.70, what is the maximum percentage of the initial feed stream that you can attain in the permeate of the second stage and still meet the 95% CO2 minimum mole fraction? What is the retentate CO2 mole fraction of this second stage? Is the retentate CO2 mole fraction of stage 2 higher or lower than the initial feed CO2 mole fraction?

ansver
Answers: 2

Another question on Engineering

question
Engineering, 04.07.2019 18:20
Agas mixture consists of 8 kmol of h2 and 2 kmol of n2. determine the mass of each gas and the apparent gas constant of the mixture.
Answers: 3
question
Engineering, 04.07.2019 19:10
An external consultant recommends that a plant installs a bank of capacitors for power factor correction. this will reduce the peak electrical demand charges by an average of 93 kw every month. the plant current pays $13 per kw in peak demand charges. the capacitor bank will include 223 kw of fixed capacitors, and 183 of variable capacitors. the fixed capacitors cost $59 per kw, and the variable capacitors will cost $65 per kw. the consultant charges 21% of the equipment costs to install the capacitors. because this project will reduce the demand for the electric utility, they are prepared to provide a one-time rebate of $42 per kw of reduced demand. what is the simple payback period for this project (in years)?
Answers: 2
question
Engineering, 04.07.2019 19:20
Apure substance is a)-mixture of various chemical elements or compounds b)-substance that has a fixed chemical composition throughout c)-mixture that is homogeneous (such as air) d)-all the answers
Answers: 3
question
Engineering, 04.07.2019 19:20
In the winter, in order to keep the classroom steadily at 68 f before 10 pm, heating with an average rate of 42,000 btu/hr is provided. assume the outdoor temperature maintains at 32°f, determine the electrical power (kw) required to (a) operate a reversible heat pump (b) operate a real heat pump with a cop (7) of 4.5 and (c) operate an electrical-resistance heater.
Answers: 3
You know the right answer?
You are to separate an O2/CO2 stream using a membrane process. The membrane to be used is silicone r...
Questions
question
Mathematics, 18.09.2019 19:30
question
Mathematics, 18.09.2019 19:30
question
Mathematics, 18.09.2019 19:30
Questions on the website: 13722361