subject
Engineering, 27.03.2021 01:00 svlext

There are seven steps in the engineering design process. Why is it important that the engineer not skip a step? It is illegal to skip a step.
Not skipping steps ensures that the best possible design is chosen and developed.
Without completing all the steps, nothing would ever be approved by the government.
Since there is a team of employees, a skipped step can mean that someone will not be compensated for his or her role in the pre
TUID

ansver
Answers: 2

Another question on Engineering

question
Engineering, 03.07.2019 14:10
When at a point two solid phase changes to one solid phase on cooling then it is known as a) eutectoid point b) eutectic point c) peritectic point d) peritectoid point
Answers: 3
question
Engineering, 03.07.2019 15:10
Two flowing streams of argon gas are adiabatically mixed to form a single flow/stream. one stream is 1.5 kg/s at 400 kpa and 200 c while the second stream is 2kg/s at 500 kpa and 100 ? . it is stated that the exit state of the mixed single flow of argon gas is 150 c and 300 kpa. assuming there is no work output or input during the mixing process, does this process violate either the first or the second law or both? explain and state all your assumptions.
Answers: 1
question
Engineering, 04.07.2019 18:10
Fluids at rest possess no flow energy. a)- true b)- false
Answers: 3
question
Engineering, 04.07.2019 18:10
The higher the astm grain size number, the finer the gran is. a)-true b)-false
Answers: 2
You know the right answer?
There are seven steps in the engineering design process. Why is it important that the engineer not s...
Questions
question
Mathematics, 29.06.2019 15:30
Questions on the website: 13722361